Hillsborough County Public Schools East Bay Classroom Addition
The scope of this project included the addition of two new classroom buildings each with 10 classrooms. One building now functions as a hurricane shelter and were built to EHPA requirements. The addition was situated at the front of the campus requiring the relocation of an existing teacher parking lot to facilitate the building construction. The campus HVAC upgrade include the replacement of one of the two 362-ton water cooled chillers, as well as the replacement of one 740-ton, two cell cooling tower with associated piping and automated controls. The school was occupied during construction, so special attention was given for student, faculty and visitor safety, keeping our construction activities separate from the school activities.
sectors
Architect
Wilder Architecture
Client
Hillsborough County Public Schools
Location
Gibsonton, FL
SF
20,407
Architect
Wilder Architecture